Rain day rescheduling: a plan for outdoor service companies
The best rain day plan is decided before it rains: a written rule for when you call the day (rain chance, wind, cold), a fixed order for rebooking (plan visits and promised dates first), one message that tells every affected customer their new time, and a list of the jobs still waiting for a date. Decide the night before or by 6 AM, and move everyone in one go.
By the Birdy team · Updated · 8 min read
When should I call a rain day?
Call it by a written rule, not a feeling at 7 AM. Most outdoor cleaning companies look at three things for the hours the crew would be on site: rain chance, wind and temperature. If any of them crosses your line, the job moves.
An example rain-day rule (set your own lines from experience and your chemical labels)
Rain chance during the job
- Example line
- 60% or more
- Why it matters
- Rain rinses chemical off before it works and puts mud back on clean flatwork
Thunder or lightning
- Example line
- Any in the forecast
- Why it matters
- Ladders, wands and roofs in a storm are a safety issue
Wind
- Example line
- 20 mph or more
- Why it matters
- Soft-wash mix drifts onto cars, plants and neighbors
Temperature
- Example line
- Below your chemical's label minimum
- Why it matters
- Some cleaning solutions don't work well in the cold, and wet surfaces can freeze
Ground already soaked
- Example line
- Standing water on the property
- Why it matters
- Runoff and mud make flatwork pointless
| Check | Example line | Why it matters |
|---|---|---|
| Rain chance during the job | 60% or more | Rain rinses chemical off before it works and puts mud back on clean flatwork |
| Thunder or lightning | Any in the forecast | Ladders, wands and roofs in a storm are a safety issue |
| Wind | 20 mph or more | Soft-wash mix drifts onto cars, plants and neighbors |
| Temperature | Below your chemical's label minimum | Some cleaning solutions don't work well in the cold, and wet surfaces can freeze |
| Ground already soaked | Standing water on the property | Runoff and mud make flatwork pointless |
Write the rule down with the person who makes the call and the time it is made (for example, "the owner decides by 6 PM the night before, or 6 AM on the day for afternoon jobs"). Customers accept a move much better at 6 PM the night before than at 8:15 AM with the crew in the driveway.
How do I read a rain forecast for a work day?
Look at the hourly forecast for the job's ZIP code, for the hours the crew will actually be there, not the day's headline. "40% chance of rain" for the day may mean a dry morning and a stormy afternoon.
- What the percentage means. The National Weather Service defines probability of precipitation as the chance that the forecast point gets at least 0.01 inch of rain. A 40% chance does not mean it rains 40% of the time.
- Use hourly, not daily. A morning house wash can go ahead on a day with storms after 2 PM.
- Check per area. In a big service area, one side of town can be dry while the other floods.
- Look three days out, decide one day out. Early warning lets you hold slots; the final call should use the latest forecast.
In what order should I rebook rained-out jobs?
Rebook by who loses most from waiting: jobs with a promised date first, then plan visits and commercial work under contract, then everything else oldest first. Write the order down so the office doesn't have to decide nine times.
- Date-critical jobs: a house being listed for sale, a party, an HOA inspection, a move-out.
- Commercial and HOA work with a contract or a manager waiting. Missed visits there cost the account.
- [Service plan](/glossary/service-plan) visits. They are already sold; keep the plan's rhythm.
- Customers who were already moved once. A second rain move needs the earliest slot and an apology.
- Everyone else, oldest booking first.
Where possible, move a crew's whole day to the next open day rather than scattering its jobs. The day was built with route density in mind; keeping it together keeps the drive short.
What should I tell customers when it rains?
Tell them early, tell them the new time in the same message, and give them an easy way to say it doesn't work. A move with a new time is good service; a cancellation with "we'll call you to rebook" is a customer who might book someone else.
A rain-day message that works
"Hi Lena, it's Palmetto Exterior Care. Tomorrow's forecast shows a 70% chance of rain from 1 PM, which would wash off the cleaning solution before it works. We've moved your house wash to Thursday, November 19, between 8 and 10 AM. If that doesn't suit you, reply and we'll find another time."
- Say why in one line. Customers accept weather; they don't accept silence.
- Give the new time, not a promise to call.
- Send it the evening before whenever you can.
- Use the channel they read. Email for most, a text where you have permission and texting is set up.
- Thank the ones who are flexible. A note on the customer record helps next time.
How do I keep track of jobs that still need a new date?
Keep one rain list: every job moved off a day for weather and not yet given a new date. The rain list should be empty within a day or two of the weather clearing. If it isn't, jobs and customers are being lost.
- Every job pulled for weather goes on the list with the reason.
- The list sorts by your rebooking order (above).
- A job leaves the list only when it has a new day, or is cancelled with a reason.
- The owner checks the list each morning in the rainy season.
What if the customer can't take the new date?
Offer two other times straight away, from days you already have work in their area. The goal is a new date in the same conversation, not a promise to call back next week.
- Give two choices, not an open calendar: "I can do Friday afternoon or Monday morning."
- Say if they don't need to be home. Most exterior work doesn't need anyone there; many customers only object because they think it does.
- For date-critical jobs, look harder. A house listing photo shoot is worth moving another flexible job for.
- If they want to wait, set the date anyway and put a note on the job. A date they can change is better than no date.
- Record why they couldn't take it. Patterns ("never Mondays") help the next booking.
What if it only rains for part of the day?
Split the day. Move the jobs that fall in the wet hours and keep the rest, starting earlier if the morning is dry. A rain-free morning with three jobs done beats a lost day.
- Move the afternoon soft washes and roofs first; they need dry time after the mix goes on.
- Keep the morning flatwork if the surface will be dry before the rain.
- Start the crew earlier where customers and local noise rules allow.
- Tell the afternoon customers by the evening before, with their new time.
How do I keep room in the schedule for rain days?
Don't book every truck to 100% in the rainy season. Leaving part of each week open gives rained-out jobs somewhere to go without pushing everyone back a week.
- Hold back some capacity in months you know are wet (for example, Friday afternoons or one day in five). Release it to new bookings a few days out if the forecast is clear.
- Have indoor or covered work ready: shop maintenance, equipment repair, estimates, garage floors, covered patios.
- Offer flexible customers a discount for "any day this week" bookings in the rainy season.
- Track rain days per month. After a season you will know how much buffer you really need.
What should a rain day policy for crews say?
Decide that in advance too, because crews want to know whether they are paid and whether to come in. A clear rain-day policy keeps good people through a wet month.
- Say whether rain days are paid, partly paid or unpaid, and when crews will hear (for example, by 6 PM the night before).
- Keep a rain-day job list: truck and trailer maintenance, pump and hose repair, chemical inventory, cleaning the shop, training a new hire on the rig.
- Use the day for estimates if a rep can still visit properties in light rain.
- Plan the next dry day together, so the crew starts it knowing it may run long.
What is a good rain day checklist?
- Check the hourly forecast for each job's area against your rule (rain, thunder, wind, temperature).
- Make the call by your set time and say who made it.
- Move the affected jobs to their new day, keeping each crew's day together where you can.
- Send every affected customer the new time in one message.
- Put jobs without a new date on the rain list.
- Tell the crews tonight what tomorrow looks like.
- Next morning, clear the rain list in rebooking order.
- Note the rain day for the season count.
How does Birdy handle rain days?
- The dispatch board shows a weather flag on jobs at risk from the National Weather Service hourly forecast for each property's ZIP, a few days ahead ("Rain 70% after 1 PM", "Wind 25 mph").
- You set the lines once: rain chance, wind and cold (the default cold line is 40°F; set it to match your chemicals).
- Move a whole day's jobs in one go to another day or back to the tray, with an undo.
- Every move that changes what the customer was told asks once whether to tell them, and sends the new time by email. Texting is being connected.
- Jobs sent back for weather land in a To rebook list until they have a new date.
- See it all on the dispatch board.
Sources
Questions
What rain chance should cancel a pressure washing job?
Many companies move a job when the hourly rain chance during the job is 60% or more, or when thunder is forecast. Set your own line from experience and write it down so the call is consistent.
Can you pressure wash in the rain?
Light rain does not stop pressure itself, but rain dilutes and rinses off cleaning solution before it works and can put dirt back on clean surfaces. Soft washing in particular needs dry time for the mix to work.
When should I tell customers about a rain day?
As early as your forecast is reliable, ideally the evening before. Always include the new time in the same message.
What does a 40% chance of rain mean?
The National Weather Service defines it as a 40% chance that the forecast point gets at least 0.01 inch of rain in the period. It does not mean it will rain 40% of the time.
Is wind a reason to reschedule soft washing?
Yes, often. Wind carries soft-wash mix onto plants, cars and neighboring property. Many companies set a wind limit, such as 20 mph, and follow their chemical label's directions.
Put this to work in Birdy
Create your account and we set it up with you, with your own customers and price list.
Keep reading
- FeatureScheduling and dispatchA day board with one row per truck, road routes on a map, rain-day moves and capacity at a glance.Read
- FeatureService plansRecurring plans where every visit has its own services, signed by the customer.Read
- TradePressure washingPressure washing software and CRM: quote by the square foot with good, better, best options, move rain days, log chemicals, bill HOAs and run crews by phone.Read
- TradeSoft washing and roof cleaningSoft wash and roof cleaning software: a sodium hypochlorite mix log, wind and cold flags, plant-protection checklists and reminders when a roof is due again.Read
- GuideRoute densityWhat route density is, how to measure it, what drive time really costs a home service crew, and practical ways to cluster jobs by area, day and plan.Read
- GuideRunning a shared office inboxHow a home service office with several people answers texts and calls without stepping on each other: owners, an unassigned queue, hand-offs and reply targets.Read
- GlossaryRain dayA rain day is a work day called off for weather, when outdoor jobs are moved to another day and every affected customer is told the new time.Read
- GlossaryDispatch boardA dispatch board is the office's view of every crew's day, by truck and time, where jobs are scheduled, moved and assigned.Read
- GlossaryService planA service plan is a signed agreement for repeat visits on a schedule, at agreed prices, such as a house wash every spring and fall.Read